Document Control Specialist – Temporary (J1835) – FILLED

Location: Minneapolis suburbs, MN Duration: long-term Position Description Seeking document control specialist candidates for a long-term contract position at our medical device client in the Minneapolis area. Prefer someone with strong engineering documentation experience (such as in documentation control or technical writing), and who has experience processing engineering/documentation/labeling change orders (ECOs) and releasing them into [...]

2018-09-20T09:34:43-05:00September 6th, 2018|Job Postings|

Engineering Technical Writer II – Temporary (J1812) – FILLED

Location: Plymouth, MN Duration: 12 months POSITION DESCRIPTION: The NDT (Nonintensive Diabetes Therapies) hardware engineering team is a small group within our client company that is creating innovative technologies as well as internal process innovation. This position is a great opportunity for someone who has good communication skills and thrives in a fast paced, results [...]

2018-10-08T14:36:54-05:00February 6th, 2018|Job Postings|
Go to Top